Submarine Cable Repair · 45.0°N 12.3°W

We mend the cables that carry the internet.

Meridian Subsea operates a global fleet of cable ships, restoring the submarine fibre-optic backbone within hours of a fault — anywhere on the seafloor, in any depth, in any weather. We hold the line while 99 % of intercontinental data travels beneath the waves.

1.2M km
Route under monitoring
142
Systems maintained
3
DP3 repair vessels
<72 h
Mean time to restore

The Fleet · three vessels, always at readiness

Three purpose-built cable ships, crewed and provisioned to sail within twelve hours of a fault being declared.

Every vessel in the Meridian fleet is a diesel-electric, dynamically-positioned cable ship: she can hold station over a fault to within two metres in a Force 7 gale, run grapnel operations to eight thousand metres, and splice fibre on deck in the open ocean.

Cable Layer & Repair · DP3

MS Meridian Resolution

Flagship. Atlantic & Arctic theatre — large-system repair and new lay.

LOA
144 m
Beam / Draft
23 m / 7.6 m
Cable capacity
5,400 t · 4 tanks
Propulsion
Diesel-electric, DP3
Bollard pull
180 t
Service speed
16 kn
Subsea assets
2 × work-class ROV, 1 × plough
Home port · Halifax, NSCommissioned 2019
Repair & Survey · DP2

MS Tethys Sentinel

Southern oceans. Shallow-shelf repair, route survey, and burial assessment.

LOA
118 m
Beam / Draft
20 m / 6.4 m
Cable capacity
3,200 t · 3 tanks
Propulsion
Diesel-electric, DP2
Bollard pull
120 t
Service speed
14.5 kn
Subsea assets
1 × work-class ROV, 1 × obs. ROV
Home port · Cape TownCommissioned 2015
Deep-Water Specialist · DP3

MS Abyssal Pathfinder

Indo-Pacific trench work. Grapnel recovery and splicing below six thousand metres.

LOA
132 m
Beam / Draft
22 m / 7.1 m
Cable capacity
4,100 t · 3 tanks
Propulsion
Diesel-electric, DP3
Bollard pull
165 t
Service speed
15 kn
Subsea assets
1 × heavy ROV (6 km), 8 km grapnel
Home port · SingaporeCommissioned 2021

Cable Health · network operations centre

The live state of every system under our watch.

Continuous optical and electrical monitoring across 142 systems. When a repeater shunts or a fibre darkens, the NOC sees it first — usually before the carrier does.

138Operational
2Degraded
2Fault
3Vessels underway
Live · streaming C-OTDR Updated 2s ago · --:--:--Z
System & segmentStatusLast C-OTDRAssigned vesselNotes
Meridian Atlantic-1MA-1 · Sector 3 — Porcupine Abyssal Plain Fault · repair 14:22:08Z MS Meridian Resolution Shunt fault; both cable ends recovered to deck
Aurora LoopSpan D — Mariana fore-arc Fault · localising 14:28:41Z MS Abyssal Pathfinder (en route) Optical loss 18 dB; C-OTDR pending at sea
Coral Sea ConnectorLeg 2 — Queensland Plateau Degraded 14:18:55Z Monitoring only Repeater noise +0.4 dB; holding under watch
Cape Route 3Span C — Agulhas Bank Survey 14:05:12Z MS Tethys Sentinel Pre-position; burial exposure assessment
Pacific Dawn LinkSpan B — Aleutian rise Operational 14:31:30Z Post-repair acceptance test passed
Northwind ExpressSector 7 — Norwegian Sea Operational 14:30:02Z Nominal; all repeaters within tolerance
Equiano SpurLeg 1 — Gulf of Guinea Operational 14:33:19Z Nominal
Fleet disposition · live Great-circle cable routes · 7 systems
60°N30°N30°S 60°E120°E MA-1 · 1,842 km Carteret · US Bude · UK Marseille · FR Fortaleza · BR Cape Town · ZA Mombasa · KE Singapore · SG
Landing station Active fault Under survey ◆ Vessel underway

The Work · anatomy of a submarine cable

Eight layers of steel, copper and glass, thinner than a garden hose, carrying terabits a second across the abyss.

A repeatered submarine cable survives four kilometres of water pressure, trawl boards and anchor drags for twenty-five years. When it breaks, our jointers strip it back to the doped-silica core and splice it under a microscope on a heaving deck. This is the object we have spent three decades learning to keep lit.

  1. Polyethylene sheathOuter jacket; resists abrasion and seawater ingress.
  2. Tarred steel wire armourOne or two layers of stranded wire; tensile and crush strength.
  3. Mylar binding tapeSecures the armour and isolates compound migration.
  4. Polycarbonate inner sheathSecondary barrier over the power conductor.
  5. Copper tubeCarries the 10 kV DC that powers every repeater along the route.
  6. Water-blocking compoundPetroleum jelly that stops a fault from flooding kilometres of fibre.
  7. Loose-tube fibre unitSix to sixteen optical fibres in a gel-filled buffer, strain-free.
  8. Doped-silica coreThe glass itself — 9 microns across, lit at 1550 nm.
01 · POLYETHYLENE 03 · MYLAR TAPE 05 · COPPER TUBE 07 · LOOSE TUBE 08 · OPTICAL FIBRE CORE

Incident Response · from alarm to restored traffic

A cable fault is a race against entropy, weather and a carrier's SLA. This is the sequence we run every time.

Times are typical for a repeatered system fault in open ocean; a shallow-water anchor drag can close in under thirty hours, a deep-trench break can take two weeks. We plan to the worst case.

T + 00:00 · Detection

A repeater shunt alarms in the NOC

Line-OTDR supervision flags an abrupt drop in the 10 kV feeding voltage on MA-1 Sector 3. Within a minute the duty engineer has opened the carrier bridge and declared a probable cable fault.

T + 00:40 · Localisation

C-OTDR fixes the break to thirty metres

Coherent optical time-domain reflectometry measures backscatter from the broken fibre and converts it to distance: 1,842 km from the Carteret shore-end, plus or minus a cable length. Coordinates are issued to the nearest vessel.

T + 01:30 · Mobilisation

The Resolution slips her readiness berth

MS Meridian Resolution clears Halifax inside twelve hours of the fault being declared, loaded with 2.4 km of spare armoured cable, two repeaters and a jointing crew. Consortia owners are formally notified of mobilisation.

T + 34:00 · On station

Dynamic positioning over the fault

The ship holds position to within two metres using thrusters and GPS, then begins a series of grapnel runs across the seabed to catch and lift the buried cable to the surface.

T + 46:00 · Recovery

Both cut ends brought to deck

The damaged section is cut away. Both healthy ends are winched aboard, inspected, and prepared for splicing. The jointing bay is rigged on the aft working deck.

T + 58:00 · Splice

A new section is fused in

Jointers fuse each fibre under a microscope, re-terminate the repeater, seal the joint and pressure-test the housing. The new 2.4 km section is paid out between the two original ends.

T + 66:00 · Re-lay & burial

The plough buries the cable three metres down

A subsea plough re-buries the repaired route to protect it from fishing gear and anchors. A post-installation test confirms continuity and repeater health along the full sector.

T + 71:00 · Restored

Traffic handed back to the carrier

Both fibre pairs are lit and provisioned back to the carrier's network. Mean time to restore is logged, the joint is warranted for twenty-five years, and the Resolution returns to readiness.

Careers · at sea and ashore

We hire mariners, fibre engineers and software people. The work is hard, the rotations are fair, and you keep the internet running.

Send your application

Cable Jointer / Splicer

At sea

Strip, prepare and fusion-splice optical fibre in the jointing bay; re-terminate repeaters and pressure-test every housing. The craft at the heart of every repair.

Rotation 6 weeks on / 4 offReports to Chief JointerLOC Fleet-wide

ROV Pilot / Technician

At sea

Fly work-class ROVs for seabed inspection, cable recovery and burial. Maintain manipulators, cameras and traction systems between dives in the vessel's hangar.

Rotation 6 weeks on / 4 offDepth rated to 6,000 mLOC Fleet-wide

Master / Deck Officer

At sea

Hold the navigation watch and run DP3 station-keeping over a fault in open ocean. STCW II/2 with DP certificate and cable-ship experience preferred.

Rotation 8 weeks on / 8 offClass DP3 unlimitedLOC Assigned vessel

NOC Engineer

Ashore

Be first to see every fault. Run C-OTDR localisation, declare incidents and drive mobilisation. Twelve-hour shifts, four on four off, at one of our three operations centres.

Pattern 4 on / 4 offReports to Head of NOCLOC Halifax · Marseille · SG

Don't see your trade listed? We are always glad to hear from welders, marine electricians, hydrographers and software engineers who want to work on the wettest infrastructure on Earth.

Contact · NOC & charter desk

Report a fault, charter a vessel, or talk maintenance.

The Network Operations Centre is staffed every hour of every day. For an active cable fault, call the NOC directly — do not wait on email.

24/7 Fault & Emergency NOC
Halifax NOC · answered in < 30 seconds
Halifax, NSOperations & NOC — 14 Purcells Cove Rd
SingaporeIndo-Pacific desk — 11 Keppel Bay View
Cape TownSouthern Oceans — 3 Duncan Dock
MarseilleAtlantic & Med — 12 Quai Rive Neuve

Report received. The NOC will acknowledge within 15 minutes — for an active fault, call the 24/7 hotline now.

This is a demonstration form. No data leaves your browser.